Metal tube scaffold exceeding 40 metres in height –.We also appreciate the time constraints on building sites, and provide a fast and efficient turnaround. 75(1) Every metal tube scaffold exceeding 40 metres in height and every other scaffold exceeding 15 metres in height shall be constructed in accordance with the design and drawings of a Professional Engineer. Scaffolding Engineer Specialist in scaffold engineering, we understand the different scaffold systems in the market and provide design, drafting and certification services.All scaffolding above 3 m in height will require a scaffolding drawing and submitted to DOSH.In accordance to the Factories and Machinery Act 1967 (Act 139) and Factories and Machinery (Building Operations and Works of Engineering Construction) (Safety) Regulations 1986) (BOWEC 1986) –.

Putlogs are placed at an interval of 1.2 to 1.5 m.ASiA Consultants has established our own procedure and systems to comply with the guidelines issued by the Department of Safety & Health (DOSH) Malaysia in 2016. Putlogs are taken out from the hole left in the wall to one end of the ledgers. Ledgers connect the standards at vertical interval of 1.2 to 1.5 m. Distance between the standards is about 2 to 2.5 m. Single scaffolding consists of standards, ledgers, putlogs etc., which is parallel to the wall at a distance of about 1.2 m. Single scaffolding is generally used for brick masonry and is also called as brick layer’s scaffolding. Types of Scaffolding used in Construction:įollowing are types of Scaffolding in construction:

It should be stable and strong to support workmen and other construction material placed on it. Scaffolding is made up of timber or steel. Types of scaffolding varies with the type of construction work. Scaffolding is a temporary structure to support the original structure as well as workmen used it as a platform to carry on the construction works. Types of Scaffolding used in Construction:.